12/25/2013 – Received this kit as a Christmas gift.
12/27/2013 – Epoxied two fins halved with Ducon 2 Ton Epoxy. Held fin together with spring clothes pins till cured. Marked and Epoxied centering ring to motor mount tube using tab of fin to adjust width between centering rings.
12/28/2013 – Epoxied third fin together and epoxied stage cone to forward end of motor mount tube.
12/29/2013 – Epoxied motor mount tube into booster body tube and epoxied fins throught slits onto the motor mount tube. Glued the coupler onto body tube.
12/30/2013 – J-B Welded the retainer ring to the aft end of the motor mount tube. This completes construction of Estes #9752 Pro Series II E2X Booster.